The ceiling was finished a few weeks ago and we have moved ahead with the framing of the walls in between hour long meetings with plumbers, electricians and code officials. We have now built out the stud walls for the three spaces, bathroom and the entry vestibule. We have also left spaces for the transome windows that will be located above each studio door, as well as a few little farmy windows that will filter a little extra light into the interior common space. There are also a few pix of the before and after of the window rehab job I did. Scraping, re-glazing and putting a new coat of paint on them has made them quite lovely. Also since the first batch of fotos was taken we've had a chance to put up the homosote sound board that will make the studios nice and quiet as well as some of the 12 foot sheets of sheetrock in the stairwell.